13 jobs at Total
Uganda * Full-time
TOTAL ENERGIES UGANDA
Context and environment
There is no project equivalent of such an industrial drilling magnitude in a remote and sensitive area within the Company today. A Green Field Project, the Tilenga field is to be found in a remote location in UGANDA near lake Albert with sensitive sensitive conditions. A challenging project; heavy and waxy oils produced from 31 drilling pads, (with some of them located in a national park) and treated in a Production Center of 200,000bopd oil capacity and 650,000 bld of water treatment capacity. Reservoir pressure maintenance is either by water injection or by polymer water injection on the reservoirs characteristics. The project also includes an extended interconnecting network with temperature preservation. Multicultural environment: Contractors are asked to be located in various parts of the world. Ugandan rules and regulations, administrative requirements and technical authorizations as well as International codes for onshore plant will apply.
Open Positions
- Drilling Completion Senior Supervisor (DCSSV)
- SIMOPS Coordinator Wellpad
- SIMOPS Coordinator CPF
- SIMOPS Leader
- Geosciences & Reservoir Data Lead
- Head of Performance
- Head of Digital, Analytics & Innovation
- Head Data Strategy, Governance, Implementation
- Site Work Preparation Engineer
- Fabric Maintenance Engineer
- Well performance Method Senior Engineer
- Drilling Completion Supervisor (DCSV) Rig 2
- Geologist
Recommended for you
HOW TO APPLY
Deadline: Expired
Related Jobs